MATERIAL RECEIVING INSPECTION REPORT

Form QF-001

Project: Qaremy Construction - NSW Solar Farm
Form No: QF-001
Revision: A


DELIVERY INFORMATION

FieldDetails
Date of Delivery:
Time of Delivery:
Supplier/Manufacturer:
Delivery Docket No:
Purchase Order No:
Delivery Vehicle:Registration: _____________ Driver: _____________

MATERIAL DETAILS

FieldDetails
Material Description:
Material Type:☐ PV Modules ☐ Electrical Equipment ☐ Cables ☐ Structural Steel
☐ Mechanical Equipment ☐ Concrete ☐ Other: _____________
Quantity Ordered:
Quantity Delivered:
Discrepancy:☐ None ☐ Short delivery ☐ Over delivery
Explain: _____________________________________________

DOCUMENTATION CHECK

DocumentRequired?Received?Comments
Delivery Docket/Packing List☐ Yes ☐ No☐ Yes ☐ No
Product Datasheet☐ Yes ☐ No☐ Yes ☐ No
Material Certificates☐ Yes ☐ No☐ Yes ☐ No
Test Certificates☐ Yes ☐ No☐ Yes ☐ No
Type Test Certificates☐ Yes ☐ No☐ Yes ☐ No
Factory Test Reports☐ Yes ☐ No☐ Yes ☐ No
Warranty Information☐ Yes ☐ No☐ Yes ☐ No
Installation Manual☐ Yes ☐ No☐ Yes ☐ No
Other: _____________☐ Yes ☐ No☐ Yes ☐ No

Documentation Status:
☐ All required documentation complete
☐ Documentation incomplete (details below)

Missing/Incomplete Documentation:




PHYSICAL INSPECTION

Packaging Condition

☐ Excellent - No damage
☐ Good - Minor damage to packaging only
☐ Fair - Some damage but material appears protected
☐ Poor - Significant damage, material may be affected

Comments: _______________________________________________________________

Visual Inspection Results

Inspection ItemSatisfactory?Comments
No physical damage to material☐ Yes ☐ No ☐ N/A
Material matches specification☐ Yes ☐ No ☐ N/A
Material identification/labeling correct☐ Yes ☐ No ☐ N/A
Serial numbers visible (if applicable)☐ Yes ☐ No ☐ N/A
No corrosion or deterioration☐ Yes ☐ No ☐ N/A
Accessories/components complete☐ Yes ☐ No ☐ N/A

Specific Checks (Material Type Dependent)

For PV Modules:

  • Glass surface: ☐ No cracks ☐ Cracks found ☐ N/A
  • Cells: ☐ No cracks/discoloration ☐ Issues found ☐ N/A
  • Frame: ☐ Straight, no damage ☐ Damage found ☐ N/A
  • Junction box: ☐ Intact and sealed ☐ Issues found ☐ N/A
  • Cables/connectors: ☐ Undamaged ☐ Damage found ☐ N/A
  • Sample size inspected: _____% or _____ modules

For Electrical Equipment:

  • Enclosure: ☐ No damage ☐ Damage found ☐ N/A
  • Nameplate data: ☐ Matches spec ☐ Does not match ☐ N/A
  • Oil level (if applicable): ☐ Correct ☐ Low ☐ N/A

For Cables:

  • Drum condition: ☐ Intact ☐ Damaged ☐ N/A
  • Cable end sealed: ☐ Yes ☐ No ☐ N/A
  • Drum rotates freely: ☐ Yes ☐ No ☐ N/A
  • Label matches spec: ☐ Yes ☐ No ☐ N/A

For Structural Steel:

  • Galvanizing: ☐ Intact ☐ Damage found ☐ N/A
  • Deformation: ☐ None ☐ Bending/damage found ☐ N/A
  • Identification markings: ☐ Visible ☐ Missing ☐ N/A

DEFECTS IDENTIFIED

Item No.Description of DefectQuantity AffectedPhoto Ref
1
2
3
4

Photos Attached: ☐ Yes (_____ photos) ☐ No ☐ Not Required


TRACEABILITY INFORMATION

Serial Numbers / Batch Numbers / Heat Numbers: (Record or attach separate sheet)




Material Traceability: ☐ Traceable to certificates ☐ Not traceable (NCR required)


STORAGE INFORMATION

Storage Location: _________________________________________________________

Storage Requirements: ☐ Under cover required
☐ Outdoor storage acceptable
☐ Temperature controlled
☐ Protected from moisture
☐ Off ground/pallets required
☐ Special handling required (describe): ____________________________________

Material Stored At: ______________________________________________________

Storage Condition Verified: ☐ Yes ☐ No ☐ N/A


INSPECTION DECISION

Accept Status

ACCEPTED
Material meets all requirements. No non-conformances identified. Cleared for storage and use.

CONDITIONALLY ACCEPTED
Minor issues identified. Material accepted pending resolution of conditions listed below:

Conditions:




Material Status: ☐ Moved to quarantine ☐ Stored with restrictions
NCR Issued: ☐ Yes (NCR No.: _________) ☐ No

REJECTED
Material does not meet requirements. Not accepted for use.

Reason for Rejection:



Material Status: ☐ Segregated on site ☐ Not offloaded
NCR Issued: ☐ Yes (NCR No.: _________)
Supplier Notified: ☐ Yes (Date: ________) ☐ No


APPROVALS

Inspector Details

Inspector Name: ___________________________
Company: __________________________________
Signature: ________________________________
Date: _____________________________________

QC Inspector Review (If applicable)

QC Inspector Name: _________________________
Reviewed and Approved: ☐ Yes ☐ No ☐ N/A
Signature: ________________________________
Date: _____________________________________

QA Manager Approval (For conditional or rejected materials)

QA Manager Name: ___________________________
Approved: ☐ Yes ☐ No ☐ N/A
Signature: ________________________________
Date: _____________________________________


DISTRIBUTION

☐ Document Controller (file)
☐ QA Manager
☐ Construction Manager
☐ Warehouse/Logistics
☐ Supplier (if rejected or conditional)
☐ Procurement Team (if rejected or conditional)


NOTES / ADDITIONAL COMMENTS







Form End

Form No: QF-001 | Revision: A | Date: October 2025
Page: 1 of 1

Quality Management System for Educational Purposes