Australian Standards Reference Guide

Qaremy Construction - NSW Solar Farm Project

Document Control

  • Document No: QAR-REF-001
  • Revision: A
  • Date: October 2025

1. Purpose

This document provides a reference guide to Australian and international standards applicable to the NSW Solar Farm project, organized by discipline and application.


2. Quality Management Standards

AS/NZS ISO 9001:2016

Title: Quality Management Systems - Requirements

Application: Overall project quality management framework

Key Requirements:

  • Context of the organization (stakeholders, scope)
  • Leadership and commitment to quality
  • Risk-based thinking
  • Planning and objectives
  • Resource management
  • Operational planning and control
  • Performance evaluation (monitoring, internal audit, management review)
  • Improvement (non-conformance, corrective action, continual improvement)

Project Usage: Basis for QMS structure, internal audits, and management reviews


3. Solar Installation Standards

AS/NZS 5033:2021

Title: Installation and safety requirements for photovoltaic (PV) arrays

Application: All PV module installations, DC wiring, and array design

Key Requirements:

  • PV module certification (IEC 61215, IEC 61730)
  • DC wiring and cable sizing (voltage drop limits)
  • String design and configuration
  • Isolation and switching requirements
  • Earthing and lightning protection
  • Labeling and documentation
  • Insulation resistance testing (minimum 1 MΩ at 500V DC)
  • Installation on mounting systems

Critical Points:

  • Clause 4: Design requirements for array configuration
  • Clause 5: Installation requirements
  • Clause 6: Earthing requirements
  • Clause 7: Isolation and switching
  • Appendix D: Testing and commissioning

Project Usage: Referenced in ITP-ELE-001 for PV module installation and DC cabling


AS/NZS 4777.1:2016

Title: Grid connection of energy systems via inverters - Part 1: Installation requirements

Application: Inverter installation and grid connection

Key Requirements:

  • Installation of inverter energy systems
  • Protection requirements
  • Labeling
  • Commissioning requirements

Project Usage: Inverter installation standards in ITP-ELE-001


AS/NZS 4777.2:2020

Title: Grid connection of energy systems via inverters - Part 2: Inverter requirements

Application: Inverter technical specifications and grid compliance

Key Requirements:

  • Response to grid disturbances (voltage, frequency)
  • Power quality requirements
  • Anti-islanding protection
  • Active power control
  • Reactive power control
  • Communication and control interfaces

Critical Settings:

  • Over/under voltage trip times
  • Over/under frequency trip times
  • Ramp rates
  • Power factor ranges

Project Usage: Inverter commissioning, protection settings, grid connection agreement compliance


4. Electrical Installation Standards

AS/NZS 3000:2018

Title: Electrical installations (Australian/New Zealand Wiring Rules)

Application: All electrical installations (LV, MV, HV wiring)

Key Requirements:

  • Protection against electric shock
  • Protection against overcurrent and earth faults
  • Cable selection and installation
  • Earthing and bonding
  • Switchgear and control gear
  • Installation methods (underground, overhead, conduits)
  • Inspection and testing requirements

Critical Clauses:

  • Section 1.5: Fundamental principles of protection
  • Section 3: Earthing arrangements
  • Section 5: Selection and installation of wiring systems
  • Section 8: Testing and inspection

Project Usage: Referenced throughout ITP-ELE-001, cable installations, earthing systems


AS 2067:2016

Title: Substations and high voltage installations exceeding 1 kV a.c.

Application: 33kV and 132kV substation installations

Key Requirements:

  • Substation design and construction
  • Clearances and safety distances
  • Earthing system design
  • Switchgear installation
  • Cable installations (HV)
  • Protection and control systems
  • Testing and commissioning

Critical Points:

  • Clause 2: Electrical design
  • Clause 3: Clearances
  • Clause 5: Earthing
  • Clause 9: Commissioning

Project Usage: HV substation design, earthing grid, HV equipment installation in ITP-ELE-001


AS/NZS 3017:2022

Title: Electrical installations - Verification guidelines

Application: Testing and verification of electrical installations

Key Requirements:

  • Inspection and testing during construction
  • Commissioning tests
  • Insulation resistance testing
  • Earth testing
  • Continuity testing
  • Polarity and phase rotation
  • Functional testing

Test Values:

  • Insulation resistance: >1 MΩ for LV, >1000 MΩ for HV
  • Earth electrode resistance: <1Ω (or per design)
  • Continuity: <0.5Ω for protective conductors

Project Usage: Testing protocols in ITP-ELE-001, commissioning procedures


5. Civil and Structural Standards

AS 3600:2018

Title: Concrete structures

Application: All concrete works (foundations, pads, civil structures)

Key Requirements:

  • Concrete mix design and specification
  • Reinforcement requirements
  • Formwork standards
  • Concrete placement and curing
  • Cover to reinforcement (minimum 50mm for external exposure)
  • Compressive strength requirements
  • Durability and exposure classifications

Exposure Classifications:

  • A1: Interior (non-aggressive)
  • A2: Interior (aggressive)
  • B1: Exterior (non-aggressive)
  • B2: Exterior (aggressive)
  • C: Buried (various sub-classifications)

Project Usage: Concrete foundation specifications in ITP-CIV-001


AS/NZS 1170 Series

Title: Structural design actions

Application: Structural design of tracker systems, mounting structures, buildings

Sub-Parts:

  • AS/NZS 1170.0:2002 - General principles
  • AS/NZS 1170.1:2002 - Permanent, imposed, and other actions
  • AS/NZS 1170.2:2021 - Wind actions
  • AS/NZS 1170.4:2007 - Earthquake actions in Australia

Key Requirements:

  • Design wind speeds by region
  • Wind load calculations for solar arrays
  • Combination of actions (wind, dead load, live load)
  • Earthquake design requirements (if applicable)

Project Usage: Structural design basis for trackers and mounting systems, wind load calculations


AS 3798:2007

Title: Guidelines on earthworks for commercial and residential developments

Application: Site earthworks, road construction, compaction

Key Requirements:

  • Site investigation and soil classification
  • Earthwork design and construction
  • Compaction requirements and testing
  • Fill placement and control
  • Drainage requirements

Compaction Standards:

  • 95% Standard Maximum Dry Density (SMDD) for general fill
  • 98% SMDD (modified) for roads and structural fill

Project Usage: Earthworks and road construction in ITP-CIV-001


AS 1289 Series

Title: Methods of testing soils for engineering purposes

Application: Soil testing for earthworks and foundations

Key Tests:

  • AS 1289.2.1.1 - Moisture content determination
  • AS 1289.3.6.1 - Particle size distribution
  • AS 1289.5.8.1 - Compaction control (field density test - sand replacement method)
  • AS 1289.6.1.1 - Soil strength (California Bearing Ratio)

Project Usage: Soil testing protocols in ITP-CIV-001


AS 1012 Series

Title: Methods of testing concrete

Application: Concrete quality control testing

Key Tests:

  • AS 1012.3.1 - Slump test (workability)
  • AS 1012.8.1 - Making test cylinders
  • AS 1012.9 - Compressive strength testing
  • AS 1012.10 - Core sampling
  • AS 1012.11 - Flexural strength

Standard Requirements:

  • Slump: Typically 80-120mm for general construction
  • Compressive strength: N32 (32 MPa at 28 days) typical minimum
  • Test frequency: 6 cylinders per pour or per 50m³

Project Usage: Concrete testing in ITP-CIV-001


6. Mechanical and Fastener Standards

AS 1252:2016

Title: High-strength steel bolts with associated nuts and washers for structural engineering

Application: Structural bolting for tracker systems and steel structures

Key Requirements:

  • Bolt grades (4.6, 8.8, 10.9)
  • Torque specifications
  • Installation requirements
  • Inspection and testing

Bolt Grades:

  • 8.8: Tensile strength 800 MPa, common for structural applications
  • 10.9: Tensile strength 1000 MPa, high-strength applications

Torque Values: Specified by bolt size, grade, and lubrication condition

Project Usage: Fastener specifications and torque requirements in ITP-MEC-001


AS 4100:2020

Title: Steel structures

Application: Structural steel design and fabrication

Key Requirements:

  • Design of steel members (beams, columns, connections)
  • Welding requirements
  • Fabrication tolerances
  • Corrosion protection

Project Usage: Tracker structure design, mounting system fabrication


AS/NZS 1163:2016

Title: Structural steel hollow sections

Application: Steel hollow sections used in tracker structures

Key Requirements:

  • Material grades (C250, C350, C450)
  • Dimensional tolerances
  • Mechanical properties
  • Certification requirements

Project Usage: Tracker structure material specifications in ITP-MEC-001


AS 2312:2014

Title: Guide to the protection of structural steel against atmospheric corrosion by the use of protective coatings

Application: Corrosion protection for all steel structures

Key Requirements:

  • Surface preparation standards
  • Coating systems for different environments
  • Galvanizing requirements
  • Inspection and quality control

Galvanizing Standards:

  • Z275: 275 g/m² coating mass (typical minimum for solar farms)
  • Z600: 600 g/m² coating mass (severe marine or industrial environments)

Project Usage: Corrosion protection inspection in ITP-MEC-001


7. Cable and Material Standards

AS/NZS 1429.1:2006

Title: Electric cables - Polymeric insulated - Part 1: For working voltages 1.9/3.3 (3.6) kV up to and including 19/33 (36) kV

Application: MV/HV cable specifications

Key Requirements:

  • Cable construction and materials
  • Insulation type (XLPE)
  • Voltage ratings
  • Type testing requirements

Common Ratings:

  • 6.35/11 kV (11kV nominal)
  • 12.7/22 kV (22kV nominal)
  • 19/33 kV (33kV nominal)

Project Usage: HV cable specifications in ITP-ELE-001


AS/NZS 5000.1:2021

Title: Electric cables - Polymeric insulated - For working voltages up to and including 0.6/1 kV - Part 1: General requirements

Application: LV cable specifications

Key Requirements:

  • Cable construction
  • Conductor sizing
  • Insulation requirements
  • Environmental ratings (UV resistance for solar)

Project Usage: LV and DC cable specifications in ITP-ELE-001


AS/NZS 61439 Series

Title: Low-voltage switchgear and controlgear assemblies

Application: LV switchboards, distribution boards, combiner boxes

Key Requirements:

  • Design verification
  • Temperature rise limits
  • Short-circuit withstand
  • IP ratings
  • Type testing and routine testing

IP Ratings:

  • IP65: Dust-tight, protected against water jets (typical for outdoor enclosures)
  • IP68: Dust-tight, immersion resistant

Project Usage: LV switchgear specifications in ITP-ELE-001


8. Testing and Certification Standards

IEC 61215 Series

Title: Terrestrial photovoltaic (PV) modules - Design qualification and type approval

Application: PV module certification

Key Tests:

  • Visual inspection
  • Performance at STC (Standard Test Conditions)
  • Wet leakage current test
  • Mechanical load test
  • Thermal cycling
  • Humidity-freeze test
  • UV preconditioning
  • Hot spot test

Project Usage: PV module acceptance, material receiving inspection


IEC 61730 Series

Title: Photovoltaic (PV) module safety qualification

Application: PV module electrical safety certification

Key Tests:

  • Construction requirements
  • Electrical safety testing
  • Fire test (Class A, B, or C)

Project Usage: PV module acceptance, safety compliance verification


IEC 62446 Series

Title: Photovoltaic (PV) systems - Requirements for testing, documentation and maintenance

Application: PV system commissioning and documentation

Key Requirements:

  • System inspection procedures
  • Testing protocols (string testing, insulation resistance, polarity)
  • Documentation requirements
  • Maintenance schedules

Project Usage: Commissioning procedures, documentation standards


9. NSW Regulatory Framework

9.1 Environmental Planning & Assessment

Environmental Planning and Assessment Act 1979

  • Development consent requirements
  • Conditions of approval compliance
  • Modification procedures

Project Usage: Ensure all construction activities comply with DA conditions


9.2 Work Health & Safety

Work Health and Safety Act 2011 (NSW)Work Health and Safety Regulation 2017

Key Requirements:

  • Workplace safety management
  • High-risk construction work (electrical work over 1kV)
  • Electrical work licensing
  • Incident notification

SafeWork NSW Codes of Practice:

  • Managing electrical risks
  • Excavation work
  • Working at heights

Project Usage: Integration of safety and quality systems


9.3 Electrical Safety

Electricity Supply Act 1995Electricity Supply (Safety and Network Management) Regulation 2014

Key Requirements:

  • Electrical work licensing
  • Network connection requirements
  • Safety management systems for electrical work
  • Incident reporting

Project Usage: Electrical licensing verification, energization procedures


9.4 Heritage

National Parks and Wildlife Act 1974

  • Aboriginal heritage protection
  • Cultural heritage assessment requirements

Heritage Act 1977

  • European heritage protection

Project Usage: Heritage clearances before civil works commence


10. Network Connection Standards

National Electricity Rules (NER)

Application: Grid connection requirements

Key Sections:

  • Chapter 5: Network connection
  • Schedule 5.2: Minimum technical requirements for generating systems

Project Usage: Grid connection compliance, performance standards


AEMO Requirements

Australian Energy Market Operator (AEMO)

Key Documents:

  • Power System Model Guidelines
  • Generating System Model Guidelines
  • GPS (Generator Performance Standards)

Project Usage: Performance testing, SCADA integration, grid connection agreement compliance


11. Standard Purchase and Access

Where to Obtain Standards

SAI Global (Standards Australia):

  • Website: www.saiglobal.com
  • Phone: 13 12 42
  • Purchase individual standards or subscriptions

Techstreet (Engineering Standards):

  • Website: www.techstreet.com

IEC Standards:

  • Website: webstore.iec.ch

Project Standards Library

A complete set of applicable standards should be maintained on site:

  • Electronic copies on project server
  • Hard copies in site office (key standards)
  • Access provided to all project personnel as needed

12. Standards Update and Amendment Tracking

Amendment Process

When standards are updated or superseded:

  1. Document Controller notifies QA Manager
  2. Review impact on project procedures and specifications
  3. Update QMS documents if required
  4. Communicate changes to project team
  5. Update standards library

Standards Register

Maintain register of applicable standards:

  • Standard number and title
  • Revision/year
  • Date obtained
  • Application in project
  • Superseded by (if applicable)

13. Quick Reference Table

DisciplineActivityPrimary Standard(s)
QualityQMSAS/NZS ISO 9001:2016
PV ModulesInstallationAS/NZS 5033:2021
InvertersInstallationAS/NZS 4777.1:2016
InvertersGrid connectionAS/NZS 4777.2:2020
LV ElectricalWiringAS/NZS 3000:2018
HV ElectricalSubstationAS 2067:2016
Electrical TestingVerificationAS/NZS 3017:2022
ConcreteConstructionAS 3600:2018
Concrete TestingQuality controlAS 1012 series
Structural DesignWind loadsAS/NZS 1170.2:2021
EarthworksConstructionAS 3798:2007
Soil TestingField testingAS 1289.5.8.1
Structural SteelDesignAS 4100:2020
FastenersBoltingAS 1252:2016
Corrosion ProtectionGalvanizingAS 2312:2014
MV/HV CablesSpecificationAS/NZS 1429.1:2006
LV CablesSpecificationAS/NZS 5000.1:2021

14. Revision History

RevisionDateDescriptionPrepared ByApproved By
AOct 2025Initial IssueQA ManagerProject Manager

END OF DOCUMENT